Innovation and Design Building – Drydock Ave
Project Details:
1st floor renovation, Drydock Ave.
Innovation and Design Building
Drydock Ave, Boston, MA
Owner: Jamestown
Completion date: Ongoing
781-261-9711
info@lighthouse-electrical.com
1st floor renovation, Drydock Ave.
Drydock Ave, Boston, MA
Owner: Jamestown
Completion date: Ongoing
Lighthouse installed lighting fixtures and power connections for the Grange Furniture showroom located at Boston Design Center on Drydock Ave.
Location: 19 Drydock Ave, Boston, MA
Renovation of new tenant space included the installation of new lighting, switching, receptacles, tel/data, A/V, security, fire alarm system, and HVAC relocation.
303 Congress St, Boston, MA
GC: Paradigm Construction
Architect: Fusion Design Consultants
Photo Credits: Paradigm Construction
Lighthouse was contracted by the system owner to provide solar installation services at six WalMart stores in Massachusetts. All six projects had very tight schedule requirements due to the Federal Tax Credit deadlines and implications on the financing. Lighthouse overcame permitting, delivery, utility and weather delays and was able to complete the solar projects and have them interconnected to the power grid in only three months, by December 31st, 2012, as scheduled. The dedicated Lighthouse team worked through severe weather conditions to have these projects on-line, as specified, turning over high quality solar installations to our client.
Lighthouse Electrical completed electrical construction for the 675 Mass Ave. office building’s lobby renovation. The scope included installation of new power and data feeds, as well as the installation of modern, energy efficient light fixtures. Lighthouse managed the project effectively, meeting the logistical challenges of a limited work space at the building’s front entrance, where safe entrance and egress is of course required for all tenants and visitors accessing the building’s upper floors.
Completion Date:
February 2013
4th floor build-out on Causeway Street, which included the installation of new light fixtures, A/V setup with flat-panel TV & speaker installation, tel/data with door intercom routed through company telephones, as well as the relocation & programming of a new fire alarm system with speakers and strobes lights.
Causeway Street, 4th Fl, Boston, MA
GC:
Siena Construction
Completion Date:
January 2013
Office fit-out for local company that provides healthy snack options. The job included electrical construction, fire alarm and A/V installations.
117 Kendrick Rd, Needham, MA
GC: Paradigm Construction
Photo Credits: Paradigm Construction
One of Boston’s most notable landmarks has had various renovations since the completion of the new facility in 1995. The Audio/Visual Room, Club Seating area and Dewar’s lounge are a few of the projects in which Lighthouse has provided electrical and tel/data installations.
Completion Date: 2009
675 Massachusetts Avenue, a high-rise office building in Cambridge, required the installation of an emergency power system. Lighthouse was engaged to purchase and install the emergency generator and wire the building for its backup power distribution. The scope included the transport and rigging of the generator, positioning it on an equipment pad at the rear of the building. Lighthouse met logistical challenges that the tight site presented, as well as navigation through the narrow roads of Cambridge with a large generator. Inside the building, Lighthouse installed MI cable runs from the basement up through all floors of the building, providing the facility with emergency power.
Unique Project Challenge: The MI cable runs presented its own set of challenges, as it is difficult to bend and very heavy. A sizable and experienced electrical crew planned and completed the task and installation in a timely manner successfully providing 675 Massachusetts Avenue with its emergency power system.
Completion Date:
January 2014