Rheos Medicine

Rheos Medicine

Project Details:

Rheos Medicine’s new Cambridge headquarters located at 245 First St. utilized existing lab office infrastructure to maximize their budget value. Approx. 20,000SF of existing lab and office space was modified and updated to fit Rheos’ program needs.  Their new facility consists of a large open general lab space in addition to Tissue Culture and Mass Spec suites.  In addition to private office and conference rooms,  their large open office space allows for a dynamic and flexible work environment.  While their Café doubles as a presentation space for larger meetings or gatherings.


Confidential Biotech Client

Confidential Biotech Client

Project Details:

Cafeteria renovation and upgrade, including installation of the eye-grabbing, custom three-form tree of light fixture that serves as a uniquely modern focal piece. Complete renovation completed in just 8 weeks.

Unique Project Challenge:

Fast-track, 8-week renovation performed in occupied space.

Cafeteria with ‘Tree of Light’

Cambridge, MA

GC:  Wise Construction Corp.

Architect:  CBT Architects


United Health – Executive Briefing Center

United Health – Executive Briefing Center

Project Details:

General electrical construction for the Boston Executive Briefing Center, an executive suite and business center with meeting rooms, a living room and pantry.  Lighthouse installed active touch screen PCs outside each meeting room, as well as scheduling assisted technology to improve workflow.

Unique Project Challenge:

Fast-track, Occupied Space

Main Street, Cambridge, MA

Job Size:  15,000 sq. ft.

GC:  Wise Construction Corp.

Architect:  RSP Architects

Photo Credit:  Richard Gayle Photography


Takeda Pharmaceuticals

Takeda Pharmaceuticals

Project Details:

In just 6 months, Lighthouse completed a 3-floor fit-out of Takeda’s Vaccine Business Unit (VBU), consisting of office space, wet labs, biology labs, shipping & receiving areas, break areas, and chemical storage space.

The third floor was finished & occupied within 4 months of renovation and materials were pre-manufactured offsite to allow for rapid installation in coordination with other subcontractors on the job.

Takeda Pharmaceuticals

Sidney Street, Cambridge, MA

Job Size:  80,000 sq. ft.

GC:  Wise Construction Corp.

Architect:  Jacobs

Completion Date:  November 2016

Photo Credit:  Richard Gayle Photography


Merrimack Pharmaceuticals

Merrimack Pharmaceuticals

Project Details:

4th floor laboratory and office space fit-out to include employee lounge, open office spaces, and conference rooms.

Unique Project Challenge:

Occupied Space

1 Kendall Square, Cambridge, MA

Job Size:  8,000 sq. ft.

GC:  Wise Construction Corp.

Architect:  MorrisSwitzer Environments for Health

Completion date:  March 2015


Alnylam Pharmaceuticals

Alnylam Pharmaceuticals

Project Details:

Two-phase renovations of the 12th, 13th, & 16th floors at 101 Main Street, Cambridge.  This project including the installation of lighting and power with DLM controls for 19 conference rooms, along with tel/data and a new Lencore Sound-Masking System.

Alnylam Pharmaceuticals

Riverfront Office Park, 101 Main Street, Cambridge, MA

GC:
Siena Construction

Completion Date:
April 2016


45-75 Sidney Street

45-75 Sidney Street

Project Details:

Multiple high-profile biotech companies have set up shop at 45-75 Sidney Street in Cambridge, MA.  Lighthouse has been their go-to electrical contractor for quick turn-around of customized tenant fit-out requirements, including installation of all electrical and tel/data systems found in the modern office environments and research laboratories.

45-75 Sidney Street

Sidney Street, Cambridge, MA

GC:
Siena Construction


No Favorites Has Been Added!