Electrical Construction
This is a partial list of recent Lighthouse Electrical Construction projects. Click project name for further details and project photo(s).
Rheos Medicine’s new Cambridge headquarters located at 245 First St. utilized existing lab office infrastructure to maximize their budget value. Approx. 20,000SF of existing lab and office space was modified and updated to fit Rheos’ program needs. Their new facility consists of a large open general lab space in addition to Tissue Culture and Mass Spec suites. In addition to private office and conference rooms, their large open office space allows for a dynamic and flexible work environment. While their Café doubles as a presentation space for larger meetings or gatherings.
Electrical fit-out project for the STHM Lab and Imaging room at Harvard University’s Laboratory for Integrated Science and Engineering (LISE) building at 11 Oxford Street in Cambridge.
Cafeteria renovation with eye-grabbing focal piece at Cambridge-based pharmaceutical company.
15,000 square foot renovation for the Boston Executive Briefing Center in Cambridge, MA.
8,000 square foot fit-out for Merkert Laboratory at Boston College.
Project Details:
Renovation & expansion of new Boston offices for this LA-based company in the cinematic industry.
Lighthouse provided electrical services for the renovation and expansion of existing H&M clothing store at 100 Newbury Street, Boston.
Project Details:
Multiple projects including renovation & expansion of corporate offices on the 6th & 7th floors of the Landmark Building in Boston’s Financial District.
Project Details:
Renovation and installation of electrical equipment including lighting, wiring, fire alarms, HVAC, mobilizations, demo, permits, & inspection
3-floor fit-out of Takeda’s Vaccine Business Unit (VBU), consisting of office space, wet labs, biology labs, shipping & receiving areas, break areas, and chemical storage space.
Fast-track electrical construction of the 30,000 square-foot, two-level Old Navy store at Millennium Tower in Downtown Crossing.
4th floor laboratory and office space fit-out for Cambridge-based biopharmaceutical company.
Electrical and low-voltage installations for modern retail fit-out in Copley Square
Ann Sacks Showroom located on waterfront property in iconic South Boston, MA.
Project Details:
In an expansion of administrative offices, Harvard Medical School took over the fifth floor of the Landmark Center in Boston and Lighthouse Electrical was awarded the electrical contract for the electrical fit-up by the project’s general contractor. The scope included power, lighting, and integration of the building’s Simplex fire alarm system. The office space, designed with open ceilings, necessitated all wiring to be installed within conduit, which was then painted to match ceiling colors for aesthetics.
Two-phase renovation of 12th, 13th, & 16th floors at 101 Main Street, Cambridge, including lights, DLM controls for 19 conference rooms, tel/data, and a new Lencore Sound-Masking System
Project Details:
Relocation to Kendall Square. Fit-out with installation of LED lighting, Fire Alarm system upgrade, tel/data
Showroom buildout on the 6th floor of the Boston Design Center located on Drydock Ave.
Electrical construction, installation of a new fire alarm system, A/V, WAPs, Security, and a White Noise System for 3-floors at this world-renowned institute.
Lighthouse has provided customized tenant fit-out requirements for multiple high-profile biotech and pharma companies that have located facilities at 45 – 75 Sidney Street in Cambridge.
Project Details:
Lighthouse Electrical provided electrical contracting services for the BBK Worldwide tenant fit-up project in a modern office space build-out. Lighthouse was tasked to install all electrical distribution, power and lighting for the offices. The lighting package required installation of many different fixtures, hung from multiple mediums. The office features open ceilings, and in some areas of the space, small portions of hard ceiling with shaped walls provide semi-defined working spaces for teams.
Project Details:
Contracted for all electrical work, including the replacement & maintenance of existing electrical equipment, fire alarm relocation, programming & testing
Electrical construction to showcase lighting fixtures for Grange Furniture showroom at Boston Design Center.
Electrical installations spanning multiple renovations on the Institute’s laboratories, storage rooms. lobby, and other facilities.
Renovation of new tenant space included the installation of new lighting, switching, receptacles, tel/data, A/V, security, fire alarm system, and HVAC relocation.
675 Massachusetts Ave, Cambridge office building’s lobby renovation
Project Details:
4th floor build-out on Causeway Street including installation of new light fixtures, tel/data system, A/V setup with flat-panel TV & speaker installation, door intercom routed through company telephones, as well as the relocation & programming of new fire alarm speakers/strobes
GAP Downtown Crossing retail store fit-out, including electrical construction and fire alarm installations.
Renovation of the Regal Fenway Stadium 13 Theatre complex at the Landmark Center on Brookline Avenue in Boston, MA.
Office fit-out for local company that included electrical construction and installation of A/V and fire alarm systems.
Project Details:
Electrical installation of lights, fire alarms, & tel/data for the new gourmet sandwich shop at Logan Airport
Lighthouse Electrical completed the tenant fit-out project for Carolina Herrera at Copley Place. The project included providing the store with comprehensive electrical installations, including power, lighting, and low voltage wiring.
Project Details:
Lighthouse Electrical provided electrical fit-up of MassChallenge’s new 25,000 square foot offices at 21 Drydock Avenue in South Boston. The scope included installation of the power, lighting and fire alarm systems, as well as tel/data cabling for the world’s largest startup accelerator organization. The converted warehouse facility features high, open ceilings, from which Lighthouse installed exposed metal-clad (MC cable) and wiring required for all branch circuiting.
Project Details:
Boston University was in the midst of expanding their lab settings, with eight (8) new labs requiring electrical fit-up. Lighthouse met the complex fit-up requirements, installing various types of sophisticated lab equipment. In addition, the project entailed Lighthouse’s installation of a 13.8kV substation, with step-down capabilities, on the roof of the building to provide power to the new labs. The project also required a new electrical room build-out, housed with associated distribution equipment which integrates the new labs and the substation.
Project Details:
675 Massachusetts Avenue, a high-rise office building in Cambridge, required the installation of an emergency power system. Lighthouse was engaged to purchase and install the emergency generator and wire the building for its backup power distribution. The scope included the transport and rigging of the generator, positioning it on an equipment pad at the rear of the building. Lighthouse met logistical challenges that the tight site presented, as well as navigation through the narrow roads of Cambridge with a large generator.