H&M Boston

H&M Boston

Project Details:

Lighthouse was contracted to provide electrical services for the renovation and expansion of the existing H&M clothing store at 100 Newbury Street in Boston. The phased project allowed for H&M keep the retail floor operational throughout the project. The project entailed installation of a new electrical room, as well as an expansive lighting package that showcases the clothing and floor space. In early project phases, Lighthouse provided installations after-hours, so as to not disrupt H&M’s operations, since much of the conduit work was being installed in adjacent retail spaces. As each phase was completed, the newly renovated space was turned over H&M, allowing the retailer to conduct operations immediately.

H & M Retail – Newbury St

100 Newbury Street, Boston, MA

Completion Date:  2016


Old Navy – Millennium Tower, Downtown Crossing

Old Navy – Millennium Tower, Downtown Crossing

Project Details:

Lighthouse Electrical completed the fast-track electrical construction of the 30,000 square-foot, two-level Old Navy store at Millennium Tower in Downtown Crossing.  The comprehensive electrical tenant fit-out project entailed installing the store’s power, lighting, fire alarm system, and exterior signage, as well as providing power to the store’s HVAC system and assisting in its commissioning.

The Old Navy store’s interior lighting requirements were a key component of the electrical scope.  The store features an open ceiling design and Lighthouse Electrical’s installations included more than 6,000 feet of Unistrut lighting grids which support the extensive LED track-lighting package.

The fire alarm system, furnished and installed by Lighthouse, integrates into the main building’s fire alarm system. The NECA Boston contractor worked in tandem with the fire alarm manufacturer, both in the system’s testing and commissioning.

Lighthouse PM Kenny Grant and Foreman Carl Freedman managed a field crew of 10 IBEW Local 103 electricians in the fast-track 4-month project.  The NECA contractor commenced construction in September 2016 and the project was completed as scheduled, in December.

Old Navy opened its Millennium Tower store in January 2017.  The Downtown Crossing store is the Northeast flagship store for the retail chain.

Old Navy – Millenium Tower, Downtown Crossing

1 Franklin Street Boston, MA

Project/Size: 30,000 sf, two-level fit-out

GC: Hirsch Construction Corp.

Architect: Sargenti Architects


L K Bennett

L K Bennett

Project Details:

Lighthouse was contracted to furnish & install all electrical & low-voltage power, distribution, and fixtures for this stylish, modern-looking retail outlet located in the Copley Square Plaza.

L K Bennett

Copley Place, 100 Huntington Ave, Boston, MA

GC:
Hirsch Construction Corp.


Ann Sacks Showroom

Ann Sacks Showroom

Project Details:

Lighthouse completed all electrical construction for the contemporary Ann Sacks Showroom located on Drydock Ave in iconic South Boston.

Ann Sack Showroom

21 Drydock Ave, Boston, MA

GC:
Desco Professional Builders

Completion date:
October 2016


Hermes Paris

Hermes Paris

Project Details:

Electrical installation of lights, fire alarms, A/V, security, & tel/data

Hermes Paris

320 Boylston Street, Boston, MA

GC:  Hirsch Construction Corp.

Architect:  Montes Laudano, LLC (Falls Church, VA)


Macy’s

Macy’s

Project Details:

Installation & ongoing maintenance of Photovoltaic system at numerous sites across MA.

Macy’s

Natick, MA

GC:
U.S. Utility Contractor, Co.

Completion Date: 
December 2014


Eileen Fisher

Eileen Fisher

Project Details:

Renovation of retail outlet at Copley Place

Eileen Fisher

Copley Place, 100 Huntington Ave, Boston, MA

GC:
Hirsch Construction Corp.


Discovery Café

Discovery Café

Project Details:

Contracted for all electrical work, including the replacement & maintenance of existing electrical equipment, fire alarm relocation, programming & testing

Discovery Café

157 Sixth St. Cambridge, MA

GC:
Siena Construction


GAP Factory Store

GAP Factory Store

Project Details:

GAP Downtown Crossing retail store fit-out, including electrical construction and fire alarm installations.

GAP Factory Store – Downtown Crossing

407 Washington Street, Boston, MA

GC:  Hirsch Construction Corp.

Architect:  Sargenti Architects


Regal Fenway 13 Theatre Renovation

Regal Fenway 13 Theatre Renovation

Project Details:

Lighthouse completed the renovation of the Regal Fenway Stadium 13 Theatre complex.  The project included a complete demolition and renovation of nine theaters at the Regal Theatre complex as well as electrical installations for the new on-site bar. The scope encompassed installation of motorized recliner seating, new speakers, exit signs, and stair lighting in nine theatres. The new cinema bar features dramatic neon lighting and is equipped with convenience outlets.

Lighthouse Project Manager Scott Sullivan headed the project team, supervising a crew of IBEW Local 103 electricians in the fast-track 4-month project, which was completed in December 2015. The NECA Boston contractor worked on the project team with general contractor Baker Incorporated of Middleton, MA.

Fenway Regal Theater

Landmark Center, 201 Brookline Ave., Boston

Project/Size:  Renovation of 13 theater complex

GC:  Baker, Inc.

Completion Date:  December 2015