Lighthouse Electrical completed the design/build 180kW photovoltaic solar project at Deer Island’s water treatment facility for the MWRA in January 2010. The company specified and installed a modular SunPower® PowerGuard® photovoltaic system comprised of 592 – 305W solar panels on the 75,000 sq. ft. roof of the Deer Island MWRA Warehouse/Maintenance building. The array covers approximately 13,000 sq. ft. The energy efficient SunPower® system is designed to lay flat on the roof, maximizing the system size. A foam blocking feature protects the roof and helps insulate the building. The system’s R-10 insulation rating will save up to 30% additional energy by reducing the building’s heating and cooling loads. The SunPower system also was specified for its high wind resistance feature as it is able to withstand winds up to 140 mph.

Project Managers, Scott Sullivan and Thomas Newell, and Foreman, Justin Aikens, supervised the field crew of 6 electricians from IBEW Local 103 in this fast-track project. Lighthouse handled design/build project services with Stephen Kelleher Architects of Fairhaven and Art Engineering of Worcester. Both firms served as subcontractors to Lighthouse Electrical.

MWRA Deer Island Solar Project, Boston, MA

System Type:
180kW Photovoltaic System

System Type:
Sunpower Power Guard PV System


No Favorites Has Been Added!