Scavolini Showroom

Scavolini Showroom

Project Details:

 

Lighthouse furnished and installed all lighting, switches, tel/data, and fire alarms, including ongoing maintenance for this showroom buildout located on the 6th floor of the Boston Design Center on Drydock Ave.

Scavolini Showroom

17 Drydock Ave, Boston, MA

Completion date:
August 2016


MIT Engine

MIT Engine

Project Details:

Electrical construction, installation of a new fire alarm system, A/V, WAPs, Security, and a White Noise System for 3-floors at this world-renowned institute.

MIT Engine

501 Mass Ave, Cambridge, MA – Floors 2, 3, 4

GC: Wise Construction Corp.

Completion date:  Ongoing


45-75 Sidney Street

45-75 Sidney Street

Project Details:

Multiple high-profile biotech companies have set up shop at 45-75 Sidney Street in Cambridge, MA.  Lighthouse has been their go-to electrical contractor for quick turn-around of customized tenant fit-out requirements, including installation of all electrical and tel/data systems found in the modern office environments and research laboratories.

45-75 Sidney Street

Sidney Street, Cambridge, MA

GC:
Siena Construction


BBK Worldwide – Tenant Fit-up

BBK Worldwide – Tenant Fit-up

Project Details:

Lighthouse provided electrical contracting services for BBK Worldwide’s modern office space build-out. Lighthouse was tasked to install all electrical distribution, power and lighting for the offices. The lighting package required installation of many different fixtures, hung from multiple mediums.

The office features open ceilings, and in some areas, small portions of hard ceiling where shaped walls provide semi-defined working spaces for teams. This unique office design with decorative lighting required detailed coordination efforts by our project foreman. The result is an outstanding contemporary office environment, delivered to BBK’s customized requirements with close attention to all specifications.

BBK Worldwide

Needham, MA

Completion Date:  July 2013


Eileen Fisher

Eileen Fisher

Project Details:

Renovation of retail outlet at Copley Place

Eileen Fisher

Copley Place, 100 Huntington Ave, Boston, MA

GC:
Hirsch Construction Corp.


Discovery Café

Discovery Café

Project Details:

Contracted for all electrical work, including the replacement & maintenance of existing electrical equipment, fire alarm relocation, programming & testing

Discovery Café

157 Sixth St. Cambridge, MA

GC:
Siena Construction


Innovation and Design Building – Drydock Ave

Innovation and Design Building – Drydock Ave

Project Details:

1st floor renovation, Drydock Ave.

Innovation and Design Building

Drydock Ave, Boston, MA

Owner:  Jamestown

Completion date: Ongoing


Grange Furniture Showroom

Grange Furniture Showroom

Project Details:

 

Lighthouse installed lighting fixtures and power connections for the Grange Furniture showroom located at Boston Design Center on Drydock Ave.

Location:  19 Drydock Ave, Boston, MA


Whitehead Institute for Biomedical Research (WIBR)

Whitehead Institute for Biomedical Research (WIBR)

Project Details:

Electrical installations spanning multiple renovations on the Institute’s laboratories, storage rooms. lobby, and other facilities.

Whitehead Institute for Biomedical Research (WIBR)

9 Cambridge Center (Kennedy Square)

GC:
Siena Construction


NAI Hunneman

NAI Hunneman

Project Details:

Renovation of new tenant space included the installation of new lighting, switching, receptacles, tel/data, A/V, security, fire alarm system, and HVAC relocation.

NAI Hunneman

303 Congress St, Boston, MA

GC:  Paradigm Construction

Architect:  Fusion Design Consultants

Photo Credits:  Paradigm Construction


No Favorites Has Been Added!