Boston Design Center

Boston Design Center

Project Details:

Renovation and installation of electrical equipment including lighting, wiring, fire alarms, HVAC, mobilizations, demo, permits, & inspection

Boston Design Center

Drydock Ave, South Boston, MA

Project/Size:
65,000 sq. ft.

GC:
Jones Lang Lasalle Construction


Takeda Pharmaceuticals

Takeda Pharmaceuticals

Project Details:

In just 6 months, Lighthouse completed a 3-floor fit-out of Takeda’s Vaccine Business Unit (VBU), consisting of office space, wet labs, biology labs, shipping & receiving areas, break areas, and chemical storage space.

The third floor was finished & occupied within 4 months of renovation and materials were pre-manufactured offsite to allow for rapid installation in coordination with other subcontractors on the job.

Takeda Pharmaceuticals

Sidney Street, Cambridge, MA

Job Size:  80,000 sq. ft.

GC:  Wise Construction Corp.

Architect:  Jacobs

Completion Date:  November 2016

Photo Credit:  Richard Gayle Photography


Old Navy – Millennium Tower, Downtown Crossing

Old Navy – Millennium Tower, Downtown Crossing

Project Details:

Lighthouse Electrical completed the fast-track electrical construction of the 30,000 square-foot, two-level Old Navy store at Millennium Tower in Downtown Crossing.  The comprehensive electrical tenant fit-out project entailed installing the store’s power, lighting, fire alarm system, and exterior signage, as well as providing power to the store’s HVAC system and assisting in its commissioning.

The Old Navy store’s interior lighting requirements were a key component of the electrical scope.  The store features an open ceiling design and Lighthouse Electrical’s installations included more than 6,000 feet of Unistrut lighting grids which support the extensive LED track-lighting package.

The fire alarm system, furnished and installed by Lighthouse, integrates into the main building’s fire alarm system. The NECA Boston contractor worked in tandem with the fire alarm manufacturer, both in the system’s testing and commissioning.

Lighthouse PM Kenny Grant and Foreman Carl Freedman managed a field crew of 10 IBEW Local 103 electricians in the fast-track 4-month project.  The NECA contractor commenced construction in September 2016 and the project was completed as scheduled, in December.

Old Navy opened its Millennium Tower store in January 2017.  The Downtown Crossing store is the Northeast flagship store for the retail chain.

Old Navy – Millenium Tower, Downtown Crossing

1 Franklin Street Boston, MA

Project/Size: 30,000 sf, two-level fit-out

GC: Hirsch Construction Corp.

Architect: Sargenti Architects


Merrimack Pharmaceuticals

Merrimack Pharmaceuticals

Project Details:

4th floor laboratory and office space fit-out to include employee lounge, open office spaces, and conference rooms.

Unique Project Challenge:

Occupied Space

1 Kendall Square, Cambridge, MA

Job Size:  8,000 sq. ft.

GC:  Wise Construction Corp.

Architect:  MorrisSwitzer Environments for Health

Completion date:  March 2015


L K Bennett

L K Bennett

Project Details:

Lighthouse was contracted to furnish & install all electrical & low-voltage power, distribution, and fixtures for this stylish, modern-looking retail outlet located in the Copley Square Plaza.

L K Bennett

Copley Place, 100 Huntington Ave, Boston, MA

GC:
Hirsch Construction Corp.


Ann Sacks Showroom

Ann Sacks Showroom

Project Details:

Lighthouse completed all electrical construction for the contemporary Ann Sacks Showroom located on Drydock Ave in iconic South Boston.

Ann Sack Showroom

21 Drydock Ave, Boston, MA

GC:
Desco Professional Builders

Completion date:
October 2016


Dalbar

Dalbar

Project Details:

Lighthouse completed the electrical construction, including tel/com cabling infrastructure, wireless access points, A/V, security, HVAC and a fire alarm upgrade as part of the corporate office fit-out for this Boston-based, financial services market research firm.

Dalbar Corporate Headquarters

303 Congress Street, Boston, MA

GC:  Paradigm Construction, Inc.

Architect:  Fusion Design

Photo Credits:  Paradigm Construction


Harvard Medical School – Expansion Fit-up

Harvard Medical School – Expansion Fit-up

Project Details:

In an expansion of administrative offices, Harvard Medical School took over the fifth floor of the Landmark Center in Boston and Lighthouse Electrical was awarded the contract for the electrical fit-up by the project’s general contractor. The scope included power, lighting, and integration of the building’s Simplex fire alarm system.

The office space, designed with open ceilings, necessitated all wiring to be installed within a conduit that would match ceiling colors for aesthetic appeal. Lighting installations included an array of linear pendant lights, which were hung at an angle to add a modern flair. Lighthouse also provided tel/data installations. HMS took occupancy of the new contemporary, open concept office as scheduled.

Unique Project Challenge: The Lighthouse Electrical crew worked night shifts so as to not disrupt operations of the facility’s primary tenant, Blue Cross/Blue Shield.

Harvard Medical School – Landmark Center

Boston, MA

GC:  Paradigm Construction

Project Size:  20,000 sq. ft.

Completion Date:  June 2014

Photo Credits:  Paradigm Construction


Alnylam Pharmaceuticals

Alnylam Pharmaceuticals

Project Details:

Two-phase renovations of the 12th, 13th, & 16th floors at 101 Main Street, Cambridge.  This project including the installation of lighting and power with DLM controls for 19 conference rooms, along with tel/data and a new Lencore Sound-Masking System.

Alnylam Pharmaceuticals

Riverfront Office Park, 101 Main Street, Cambridge, MA

GC:
Siena Construction

Completion Date:
April 2016


Hermes Paris

Hermes Paris

Project Details:

Electrical installation of lights, fire alarms, A/V, security, & tel/data

Hermes Paris

320 Boylston Street, Boston, MA

GC:  Hirsch Construction Corp.

Architect:  Montes Laudano, LLC (Falls Church, VA)