Grange Furniture Showroom
Project Details:
Lighthouse installed lighting fixtures and power connections for the Grange Furniture showroom located at Boston Design Center on Drydock Ave.
Location: 19 Drydock Ave, Boston, MA
781-261-9711
info@lighthouse-electrical.com
Holds our projects
Lighthouse installed lighting fixtures and power connections for the Grange Furniture showroom located at Boston Design Center on Drydock Ave.
Location: 19 Drydock Ave, Boston, MA
Electrical installations spanning multiple renovations on the Institute’s laboratories, storage rooms. lobby, and other facilities.
9 Cambridge Center (Kennedy Square)
GC:
Siena Construction
Revitalization of the Old Colony Housing Project in South Boston featured a 2-phase solar installation project.
In the first phase, Lighthouse installed 140kW of roof-mounted solar systems on five residential buildings. Three buildings were smaller pitched roof installations; the other two featuring ballasted roof-mount systems.
In the second phase, Lighthouse installed 90kW rooftop solar (PV) systems on two flat residential buildings. Both phases of the project were closely coordinated with the general contractor, as significant ongoing renovation work continued throughout the solar installation.
Special Project Challenge: Safety, as in all projects, was paramount. This project required special safety considerations and techniques. A combination of flagging, hard hand-rails and tie-off ropes were required to install the PV systems, as the roof-mounted arrays were designed outside the safe working area of the roofs.
The projects were completed on-time and without incident.
Boston, MA
Renovation of new tenant space included the installation of new lighting, switching, receptacles, tel/data, A/V, security, fire alarm system, and HVAC relocation.
303 Congress St, Boston, MA
GC: Paradigm Construction
Architect: Fusion Design Consultants
Photo Credits: Paradigm Construction
Lighthouse was contracted by the system owner to provide solar installation services at six WalMart stores in Massachusetts. All six projects had very tight schedule requirements due to the Federal Tax Credit deadlines and implications on the financing. Lighthouse overcame permitting, delivery, utility and weather delays and was able to complete the solar projects and have them interconnected to the power grid in only three months, by December 31st, 2012, as scheduled. The dedicated Lighthouse team worked through severe weather conditions to have these projects on-line, as specified, turning over high quality solar installations to our client.
Lighthouse Electrical completed electrical construction for the 675 Mass Ave. office building’s lobby renovation. The scope included installation of new power and data feeds, as well as the installation of modern, energy efficient light fixtures. Lighthouse managed the project effectively, meeting the logistical challenges of a limited work space at the building’s front entrance, where safe entrance and egress is of course required for all tenants and visitors accessing the building’s upper floors.
Completion Date:
February 2013
4th floor build-out on Causeway Street, which included the installation of new light fixtures, A/V setup with flat-panel TV & speaker installation, tel/data with door intercom routed through company telephones, as well as the relocation & programming of a new fire alarm system with speakers and strobes lights.
Causeway Street, 4th Fl, Boston, MA
GC:
Siena Construction
Completion Date:
January 2013
GAP Downtown Crossing retail store fit-out, including electrical construction and fire alarm installations.
407 Washington Street, Boston, MA
GC: Hirsch Construction Corp.
Architect: Sargenti Architects
Lighthouse completed the renovation of the Regal Fenway Stadium 13 Theatre complex. The project included a complete demolition and renovation of nine theaters at the Regal Theatre complex as well as electrical installations for the new on-site bar. The scope encompassed installation of motorized recliner seating, new speakers, exit signs, and stair lighting in nine theatres. The new cinema bar features dramatic neon lighting and is equipped with convenience outlets.
Lighthouse Project Manager Scott Sullivan headed the project team, supervising a crew of IBEW Local 103 electricians in the fast-track 4-month project, which was completed in December 2015. The NECA Boston contractor worked on the project team with general contractor Baker Incorporated of Middleton, MA.
Landmark Center, 201 Brookline Ave., Boston
Project/Size: Renovation of 13 theater complex
GC: Baker, Inc.
Completion Date: December 2015
Turn-key installation of PV system on existing landfill, including the modules & racking along with the installation & wiring with necessary conduits, grounding, inverters, 1000 KVA transformer, etc.
Huntington Ave, Methuen, MA
GC:
Borrego Solar Systems, Inc.