Grange Furniture Showroom

Grange Furniture Showroom

Project Details:

 

Lighthouse installed lighting fixtures and power connections for the Grange Furniture showroom located at Boston Design Center on Drydock Ave.

Location:  19 Drydock Ave, Boston, MA


Whitehead Institute for Biomedical Research (WIBR)

Whitehead Institute for Biomedical Research (WIBR)

Project Details:

Electrical installations spanning multiple renovations on the Institute’s laboratories, storage rooms. lobby, and other facilities.

Whitehead Institute for Biomedical Research (WIBR)

9 Cambridge Center (Kennedy Square)

GC:
Siena Construction


Old Colony Phase I & II

Old Colony Phase I & II

Project Details:

Revitalization of the Old Colony Housing Project in South Boston featured a 2-phase solar installation project.

In the first phase, Lighthouse installed 140kW of roof-mounted solar systems on five residential buildings. Three buildings were smaller pitched roof installations; the other two featuring ballasted roof-mount systems.

In the second phase, Lighthouse installed 90kW rooftop solar (PV) systems on two flat residential buildings.  Both phases of the project were closely coordinated with the general contractor, as significant ongoing renovation work continued throughout the solar installation.

Special Project Challenge: Safety, as in all projects, was paramount.  This project required special safety considerations and techniques. A combination of flagging, hard hand-rails and tie-off ropes were required to install the PV systems, as the roof-mounted arrays were designed outside the safe working area of the roofs.

The projects were completed on-time and without incident.

Boston, MA


NAI Hunneman

NAI Hunneman

Project Details:

Renovation of new tenant space included the installation of new lighting, switching, receptacles, tel/data, A/V, security, fire alarm system, and HVAC relocation.

NAI Hunneman

303 Congress St, Boston, MA

GC:  Paradigm Construction

Architect:  Fusion Design Consultants

Photo Credits:  Paradigm Construction


Walmart, Tewksbury, MA

Walmart, Tewksbury, MA

Project Details:

Lighthouse was contracted by the system owner to provide solar installation services at six WalMart stores in Massachusetts. All six projects had very tight schedule requirements due to the Federal Tax Credit deadlines and implications on the financing. Lighthouse overcame permitting, delivery, utility and weather delays and was able to complete the solar projects and have them interconnected to the power grid in only three months, by December 31st, 2012, as scheduled. The dedicated Lighthouse team worked through severe weather conditions to have these projects on-line, as specified, turning over high quality solar installations to our client.


675 Massachusetts Ave. – Lobby Renovation

675 Massachusetts Ave. – Lobby Renovation

Project Details:

Lighthouse Electrical completed electrical construction for the 675 Mass Ave. office building’s lobby renovation. The scope included installation of new power and data feeds, as well as the installation of modern, energy efficient light fixtures. Lighthouse managed the project effectively, meeting the logistical challenges of a limited work space at the building’s front entrance, where safe entrance and egress is of course required for all tenants and visitors accessing the building’s upper floors.

675 Massachusetts Ave. – Lobby Renovation, Cambridge, MA

Completion Date:
February 2013


March Communications

March Communications

Project Details:

4th floor build-out on Causeway Street, which included the installation of new light fixtures, A/V setup with flat-panel TV & speaker installation, tel/data with door intercom routed through company telephones, as well as the relocation & programming of a new fire alarm system with speakers and strobes lights.

March Communications

Causeway Street, 4th Fl, Boston, MA

GC:
Siena Construction

Completion Date:
January 2013


GAP Factory Store

GAP Factory Store

Project Details:

GAP Downtown Crossing retail store fit-out, including electrical construction and fire alarm installations.

GAP Factory Store – Downtown Crossing

407 Washington Street, Boston, MA

GC:  Hirsch Construction Corp.

Architect:  Sargenti Architects


Regal Fenway 13 Theatre Renovation

Regal Fenway 13 Theatre Renovation

Project Details:

Lighthouse completed the renovation of the Regal Fenway Stadium 13 Theatre complex.  The project included a complete demolition and renovation of nine theaters at the Regal Theatre complex as well as electrical installations for the new on-site bar. The scope encompassed installation of motorized recliner seating, new speakers, exit signs, and stair lighting in nine theatres. The new cinema bar features dramatic neon lighting and is equipped with convenience outlets.

Lighthouse Project Manager Scott Sullivan headed the project team, supervising a crew of IBEW Local 103 electricians in the fast-track 4-month project, which was completed in December 2015. The NECA Boston contractor worked on the project team with general contractor Baker Incorporated of Middleton, MA.

Fenway Regal Theater

Landmark Center, 201 Brookline Ave., Boston

Project/Size:  Renovation of 13 theater complex

GC:  Baker, Inc.

Completion Date:  December 2015


Methuen Landfill

Methuen Landfill

Project Details:

Turn-key installation of PV system on existing landfill, including the modules & racking along with the installation & wiring with necessary conduits, grounding, inverters, 1000 KVA transformer, etc.

Methuen Landfill

Huntington Ave, Methuen, MA

GC:
Borrego Solar Systems, Inc.


No Favorites Has Been Added!