Fusion Design

Fusion Design

Project Details:

Electrical construction, tel/data and security for Fusion Design Consultants

Fusion Design Consultants

300 Summer St, Boston, MA

GC:  Paradigm Construction

Architect: Fusion Design

Photo Credits:  Paradigm Construction


Liquiglide

Liquiglide

Project Details:

For their relocation to Kendall Square, Liquiglide contracted Lighthouse to undertake this renovation that included installation of modern LED lighting and tel/data setup, along with fire alarm system upgrades.

Photo Credit:  ThumatiPics

Liquiglide

Kendall Square, 75 Sidney Street, Cambridge, MA

Project/Size:
11,000 sq. ft.

GC:
Siena Construction

Architect:
Interior Architects


Macy’s

Macy’s

Project Details:

Installation & ongoing maintenance of Photovoltaic system at numerous sites across MA.

Macy’s

Natick, MA

GC:
U.S. Utility Contractor, Co.

Completion Date: 
December 2014


Scavolini Showroom

Scavolini Showroom

Project Details:

 

Lighthouse furnished and installed all lighting, switches, tel/data, and fire alarms, including ongoing maintenance for this showroom buildout located on the 6th floor of the Boston Design Center on Drydock Ave.

Scavolini Showroom

17 Drydock Ave, Boston, MA

Completion date:
August 2016


MIT Engine

MIT Engine

Project Details:

Electrical construction, installation of a new fire alarm system, A/V, WAPs, Security, and a White Noise System for 3-floors at this world-renowned institute.

MIT Engine

501 Mass Ave, Cambridge, MA – Floors 2, 3, 4

GC: Wise Construction Corp.

Completion date:  Ongoing


45-75 Sidney Street

45-75 Sidney Street

Project Details:

Multiple high-profile biotech companies have set up shop at 45-75 Sidney Street in Cambridge, MA.  Lighthouse has been their go-to electrical contractor for quick turn-around of customized tenant fit-out requirements, including installation of all electrical and tel/data systems found in the modern office environments and research laboratories.

45-75 Sidney Street

Sidney Street, Cambridge, MA

GC:
Siena Construction


BBK Worldwide – Tenant Fit-up

BBK Worldwide – Tenant Fit-up

Project Details:

Lighthouse provided electrical contracting services for BBK Worldwide’s modern office space build-out. Lighthouse was tasked to install all electrical distribution, power and lighting for the offices. The lighting package required installation of many different fixtures, hung from multiple mediums.

The office features open ceilings, and in some areas, small portions of hard ceiling where shaped walls provide semi-defined working spaces for teams. This unique office design with decorative lighting required detailed coordination efforts by our project foreman. The result is an outstanding contemporary office environment, delivered to BBK’s customized requirements with close attention to all specifications.

BBK Worldwide

Needham, MA

Completion Date:  July 2013


Eileen Fisher

Eileen Fisher

Project Details:

Renovation of retail outlet at Copley Place

Eileen Fisher

Copley Place, 100 Huntington Ave, Boston, MA

GC:
Hirsch Construction Corp.


Discovery Café

Discovery Café

Project Details:

Contracted for all electrical work, including the replacement & maintenance of existing electrical equipment, fire alarm relocation, programming & testing

Discovery Café

157 Sixth St. Cambridge, MA

GC:
Siena Construction


Innovation and Design Building – Drydock Ave

Innovation and Design Building – Drydock Ave

Project Details:

1st floor renovation, Drydock Ave.

Innovation and Design Building

Drydock Ave, Boston, MA

Owner:  Jamestown

Completion date: Ongoing


No Favorites Has Been Added!